List of Bomber-Attack Aircraft with detailed specification:
B-1 Lancer
General Chracteristics of B-1 Lancer are as Below:
Role: | Supersonic heavy strategic bomber |
National origin: | United States |
Manufacturer: |
North American Rockwell/Rockwell International Boeing |
First flight: | 23-Dec-1974 |
Introduction: | 1-Oct-86 |
Status: | In service |
Primary users: | United States Air Force |
Produced: | 1973–74, 1983–88 |
Number built: |
B-1A: 4 B-1B: 100 |
Unit cost: | US$283.1 million in 1998 (B-1B) |
B-2 Spirit
General Chracteristics of B-2 Spirit are as Below:
Role: | Strategic stealth bomber |
National origin: | United States |
Manufacturer: |
Northrop Corporation Northrop Grumman |
First flight: | 17-Jul-1989 |
Introduction: | Apr-97 |
Status: | In service |
Primary users: | United States Air Force |
Produced: | 1987–2000 |
Number built: | 21 |
Program cost: | US$44.75 billion (through 2004) |
Unit cost: | $737 million (1997 approx. flyaway cost) |
B-52 Stratofortress
General Chracteristics of B-52 Stratofortress are as Below:
Role: | Strategic bomber |
National origin: | United States |
Manufacturer: | Boeing |
First flight: | 15-Apr-1952 |
Introduction: | Feb-55 |
Status: | In service |
Primary users: |
United States Air Force NASA |
Produced: | 1952–62 |
Number built: | 744 |
Unit cost: |
B-52B: US$14.43 million (1956);US$126.93M (2016 with inflation) B-52H: US$9.28M (1962); US$84M (2012 with inflation) |
Developed into: | Conroy Virtus |
A-10 Thunderbolt II
General Chracteristics of A-10 Thunderbolt II are as Below:
Role: | Fixed-wing close air support, forward air control, and ground-attack aircraft |
National origin: | United States |
Manufacturer: | Fairchild Republic |
First flight: | 23-Dec-1974 |
Introduction: | Mar-77 |
Status: | In service |
Primary users: | United States Air Force |
Produced: | 1972–84 |
Number built: | 716 |
Unit cost: | US$18.8 million |
AC-130 Spectre
General Chracteristics of AC-130 Spectre are as Below:
Role: | Fixed-wing Ground-attack and close air support gunship |
Manufacturer: |
Lockheed and Boeing Boeing |
First flight: | AC-130A: 1966 |
Introduction: |
AC-130A: 1968 AC-130H: 1969 |
Retired: |
AC-130A: 1995 AC-130H: 2015 |
Status: | In service |
Primary users: | United States Air Force |
Number built: | 47 (in all variants) |
Unit cost: |
AC-130H: US$132.4 million AC-130U: US$253 million (2016) |
Developed from: | Lockheed C-130 Hercules |
AS9120B and ISO 9001:2015 |
|
Aviation Suppliers Association Member |
|
FAA AC 0056B Accredited |
|
AS 6081:2012 Certification |
|
ESD S20.20-2014 Certification |
Don’t forget That We offer 24/7 Service, Competitive Prices, and Fast Deliveries. We Hope You'll Make Us Your One-Stop Purchasing Solution!
Request for Quote